Define the instruction at the right stage
Premier Reinstatements supports loss adjusters and insurers seeking a contractor for property investigation and reinstatement in Lancashire and Greater Manchester. Our services include leak detection, trace and access, drying, strip-out and the building repairs needed to reinstate the affected areas.
An instruction can begin with investigation, assessment of damage, a quotation against an existing schedule or delivery of an authorised repair. State the intended output and the information already available so the first stage addresses the actual requirement.
Information for an actionable instruction
- Your organisation, named contact, claim reference and property address or postcode.
- The reported event, affected areas, current condition and any confirmed findings.
- The task being instructed, existing schedule, approval limits and authority for additional work.
- Occupier contact arrangements, access restrictions and other parties working at the property.
- The quotation, progress information and completion evidence required, together with the agreed recipient.
Survey, quotation and scope decisions
We review the available information and agree the assessment or investigation needed. An existing schedule provides a starting point; unresolved causes, concealed damage and the condition of materials may require further findings before the complete repair can be priced.
Agree the work, exclusions, assumptions and commercial arrangements before the relevant stage proceeds. Distinguish the source repair, access, drying and reinstatement where those distinctions matter to the instruction. If findings change the scope, identify who will review and approve the proposal.
Keep the instruction connected to delivery
Coordinate access with the occupier or site contact and establish the sequence of preparation, drying and repairs for the property. Agree the reporting requirements at the outset, including who needs updates and what completion information is expected.
Approved organisations can raise jobs, review quotations, approve work and follow progress in the client portal. The portal supports the repair instruction; insurance cover, settlement and contractor authorisation remain decisions for the relevant parties.
A documented insurance repair
Our Worsley bathroom reinstatement followed two leaks and extensive floor damage. The project included floor replacement work, reinforcement for a new shower tray former, tanking and a replacement bathroom.
The customer contributed their own funds alongside the insurance payout for upgraded finishes. The case records that distinction and shows photographs of preparation and completion, without suggesting that an insurer funded every improvement.
Arrange a first instruction
Use professional enquiries with the property postcode, instruction type and your reference. The contractor information pack (PDF) is an introduction; confirm any required procurement documents and suitability for the proposed instruction directly with us.
Premier is based in Rossendale. Our coverage pages explain the core Lancashire and Greater Manchester locations. Any insurer-panel or preferred-supplier appointment would require separate confirmation; none is implied by this page.
Prepare for your repair enquiry
Bring a clearer record of the damage, responsibilities and work you want assessed.
